Successful experience in an enterprise of energy sector

Sector
Heating and cooling systems
Products
Nes plant

Process design / product industrialisation

Overview

Process design (detailed lay out) of the new facility  in Spain of a Swedish manufacturer of heating and cooling pump systems, including the industrialisation of a new product to be developped on this facilities.

Objectives

Cost, batch, and lead time reductions in the new product manufacturing.

Scope

Main aspects:

  • Chain value analysis (VSM):  objectives deployment  and actions
  • Cost-benefit analysis of the different subcontracting alternatives
  • Functional specification of the machinery
  • Detailed lay out definition of the new plant 

Achievements

“Make or buy“ analysis of components by single machine:

  • Lead-time optimisation
  • Inventory reduction
  • Supply simplification

Assembly line position design and balance. Continuous flow implementation:

  • Lead-time optimisation
  • Inventory reduction
  • Defective reduction

Images

    

 

 

Privacy Terms   |   |  RSS