|
|
|
|
HADA - Helicóptero Adaptativo Avion
|
Sector
Aeronautics
Services
Lead-time reduction
|
Needs
- Programas serie: improve the on-time deliveries ratio, both in quantity and in quality reducing the LT by the implementation of a continuous improvement system, pull flow of activities synchronising and visibility in production to lean manufacturing
- Programas no seriados – unit references (satellites reflectors): improve the on-time deliveries ratio, both in quantity and in quality reducing the LT by the implementation of a continuous improvement system, pull flow of activities synchronising and visibility in production and design to lean manufacturing and lean design
Solution
- Programas serie:
- Lean manufacturing: Visual panel, synchronising sheets (“golf ball”), assembly kits, continuous improvement systems in critical resources, 5 S’s, SMED
- Programas no seriados – unit references (satellites reflectors):
- Lean manufacturing: Visual panel, synchronising sheets (“golf ball”), assembly kits, continuous improvement systems in critical resources, 5 S’s, SMED
- Lean desing: Visual panel, knowledge management system
Principal achievements
- Programas serie:
- Lean manufacturing: “lean culture” implementation in the enterprise. LT reduction (30-50% in some phases), OEE improvement in the critical resources (10-20%), missing parts and stock break in assembly reduction
- Programas no seriados – unit references (satellites reflectors):
- Lean manufacturing: “lean culture” implementation in the enterprise
- Lean design: “lean culture” implementation in the enterprise
|
|
|
|