HADA - Helicóptero Adaptativo Avion

Manufacturing flow optimisation

Sector
Aeronautics
Services
Lead-time reduction

Needs

  • Programas serie: improve the on-time deliveries ratio, both in quantity and in quality reducing the LT by the implementation of a continuous improvement system, pull flow of activities synchronising and visibility in production to lean manufacturing
  • Programas no seriados – unit references (satellites reflectors): improve the on-time deliveries ratio, both in quantity and in quality reducing the LT by the implementation of a continuous improvement system, pull flow of activities synchronising and visibility in production and design to lean manufacturing and lean design

Solution

  • Programas serie:
    • Lean manufacturing: Visual panel, synchronising sheets (“golf ball”), assembly kits, continuous improvement systems in critical resources, 5 S’s, SMED 
  • Programas no seriados – unit references (satellites reflectors):
    • Lean manufacturing: Visual panel, synchronising sheets (“golf ball”), assembly kits, continuous improvement systems in critical resources, 5 S’s, SMED
    • Lean desing: Visual panel, knowledge management system

Principal achievements

  • Programas serie:
    • Lean manufacturing: “lean culture” implementation in the enterprise. LT reduction (30-50% in some phases), OEE improvement in the critical resources (10-20%), missing parts and stock break in assembly reduction
  • Programas no seriados – unit references (satellites reflectors):
    • Lean manufacturing: “lean culture” implementation in the enterprise
    • Lean design: “lean culture” implementation in the enterprise 

 

 

 

 

        

 

 

Privacy Terms   |   |  RSS